CW Coil Module for Size 1 Modular Fans - 1,000 thru 3,250 CFM (3 Ton, 5WS0604B-31.5x27.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 1 Modular Fans - 1,000 thru 3,250 CFM (5 Ton, 5WS1004B-31.5x27.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 1 Modular Fans - 1,000 thru 3,250 CFM (10 Ton, 5WS1204B-31.5x27.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 1 Modular Fans - 1,000 thru 3,250 CFM (12.5 Ton, 5WS1404B-31.5x27.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 2 Modular Fans - 1,500 thru 5,300 CFM (5 Ton, 5WS0604B-37.5x36.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 2 Modular Fans - 1,500 thru 5,300 CFM (10 Ton, 5WS1004B-37.5x36.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 2 Modular Fans - 1,500 thru 5,300 CFM (15 Ton, 5WS1204B-37.5x36.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 2 Modular Fans - 1,500 thru 5,300 CFM (20 Ton, 5WS1404B-37.5x36.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 3 Modular Fans - 3,000 thru 7,000 CFM (10 Ton, 5WS0604B-43.5x42.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 3 Modular Fans - 3,000 thru 7,000 CFM (15 Ton, 5WS1004B-43.5x42.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 3 Modular Fans - 3,000 thru 7,000 CFM (20 Ton, 5WS1204B-43.5x42.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 3 Modular Fans - 3,000 thru 7,000 CFM (25 Ton, 5WS1404B-43.5x42.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 4 Modular Fans - 5,000 thru 9,650 CFM (20 Ton, 5WS0604B-52.5x48.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 4 Modular Fans - 5,000 thru 9,650 CFM (25 Ton, 5WS0804B-52.5x48.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 4 Modular Fans - 5,000 thru 9,650 CFM (30 Ton, 5WS1004B-52.5x48.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 4 Modular Fans - 5,000 thru 9,650 CFM (40 Ton, 5WS1204B-52.5x48.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 5 Modular Fans - 8,000 thru 14,200 CFM (30 Ton, 5WS0604B-55.5x67.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 5 Modular Fans - 8,000 thru 14,200 CFM (40 Ton, 5WS0804B-55.5x67.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.
CW Coil Module for Size 5 Modular Fans -8,000 thru 14,200 CFM (50 Ton, 5WS1004B-55.5x67.0) Not stocked. Allow 5-6 weeks lead time. Temperature controls, mixing valves, thermostats, and freeze protection by others.